Products
menu item
Prospect
Quick estimate of PV site's solar potential
menu item
Evaluate
Time Series & TMY data for energy modelling
menu item
Monitor
Real-time PV output assessment
menu item
Forecast
Solar power output forecast for up to 14 days
menu item
Analyst
Simplified & unified solar data management
menu item
Integrations
Automate delivery of Solargis data
Use cases
menu item
Site selection
Find the right solar project location
menu item
Energy yield simulation
Analyze potential gains and risks
menu item
Optimizing power plant design
Find optimum power plant design
menu item
Real power plant performance
Discover the true output
menu item
Power output forecast
Predict solar project energy output
menu item
Ground data verification
Verify quality of solar & meteo measurements
Solar Resource & Meteo Assessment
Detailed solar resource validation and assessment
Site Adaptation of Solargis Models
Combining satellite data with on-site measurements
Quality Control of Solar & Meteo Measurements
Correction of errors in ground-measured data
Customized GIS Data
Customized Solargis GIS data for your applications
PV Energy Yield Assessment
Estimated energy uncertainties and related data inputs
PV Performance Assessment
Energy estimate for refinancing or asset acquisition
PV Variability & Storage Optimization Study
Understand output variability across wide geo regions
Regional Solar Energy Potential Study
Identification of locations for solar power plants
Our expertise
How our technology works
Methodology
How we transform science into technology
API & integration
How to integrate Solargis data via API
Product guides & documentation
Release notes
Success stories
Blog
Ebooks & Whitepapers
Webinars
Publications
Events
Free Maps & GIS Data
Solar performance maps
About Solargis
Partners
ISO Certification
Careers

Solar project financing is a complex and risky process that relies on accurate and reliable data on resource and variability.

One of the key challenges for solar project financiers is to assess the expected energy production and revenue of a project over its lifetime, considering the uncertainties and fluctuations of the solar resource.

Common metrics used to overcome financial uncertainty

Project financiers typically quantify the uncertainty of solar resource by using probabilistic metrics, such as P50, P70 and P90. These represent the probability of exceeding – or falling short of - a certain level of energy production in a given period.

For reference, P50 denotes a 50% chance that actual energy production will be higher than the P50 value, and a 50% chance it will be lower. Similarly, P70 describes a 70% chance energy production will be higher than the P70 value, and a 30% chance it will be lower.

probability blog img 980x700

Figure 1: P50, P75, P90 and P99 value represented in a normal distribution

But … probabilistic metrics have blind spots

Critically, these widely used metrics are highly dependent on the quality and resolution of the solar resource data used to calculate them.

Low-quality or low-resolution data can lead to inaccurate or unrealistic estimates of the energy production and revenue of a solar project, which can have serious consequences for the project's financial viability and its attractiveness for investors.

One of the most important aspects of solar resource data quality is the temporal resolution.

Why?

If the temporal resolution of solar resource data is too coarse (e.g., hourly or daily), it will miss several short-term fluctuations or peaks of the solar irradiance that can have a significant impact on a project’s energy production and revenue.

That’s why the industry needs to move towards collecting weather and solar irradiance data at shorter intervals. By accurately capturing the solar irradiance variability, weather and PV power potential of a chosen solar plant site, 1-min data helps bring financial certainty to a project.

Four reasons why project financiers need 1-min data

Through extensive research and studies, Solargis has found that one of the best temporal resolutions for solar project financing is 1-minute solar data. This is because solar project financiers can use 1-min solar data to help them:

  1. Capture most of the relevant variability and frequency distribution of the solar irradiance, which affects the revenue of a solar project and energy production, such as clipped energy by inverters.
  2. Model and simulate different types of solar technologies and systems more accurately, such as PV modules, inverters, trackers, and batteries.
  3. Analyze and optimize different aspects of a solar project in more detail, such as string and battery sizing, design, layout, orientation, shading, losses, and performance ratio
  4. Assess and mitigate the risks of a solar project more robustly and transparently, such as hedging, insurance, and guarantees

1-minute solar resource data is essential for solar project financiers to obtain realistic and reliable estimates of the energy production and revenue of a solar project.

To read our 1-min data blog series, please click on one of the links below.

To find out more about how we can support you with your solar data needs, please get in touch here.

Keep reading

Why to use satellite-based solar resource data in PV performance assessment
Best practices

Why to use satellite-based solar resource data in PV performance assessment

It is widely accepted that high-standard pyranometers operated under rigorously controlled conditions are to be used for bankable performance assessment of photovoltaic (PV) power systems.

How Solargis is improving accuracy of solar power forecasts
Best practices

How Solargis is improving accuracy of solar power forecasts

Just as there are horses for courses, different forecasting techniques are more suitable depending on the intended forecast lead time.

How to calculate P90 (or other Pxx) PV energy yield estimates
Best practices

How to calculate P90 (or other Pxx) PV energy yield estimates

To assess the solar resource or energy yield potential of a site, we model the solar resource/energy yield using best available information and methods. The resulting estimate is the P50 estimate, or in other words, the “best estimate”. P50 is essentially a statistical level of confidence suggesting that we expect to exceed the predicted solar resource/energy yield 50% of the time. However, ...