Ground-measured solar data is often treated as the ground truth. It is used to evaluate PV plant performance, validate models, adapt satellite-based datasets to local conditions, calculate expected production, and assess whether an asset is performing as it should.

But measured data is never perfect.

Instrument faults, installation issues, environmental effects, soiling, shading, calibration drift, and sensor misalignment can all introduce errors. Some are obvious. Others are subtle and can remain hidden in the data for months.

The problem is not only that these issues exist. The real problem is that they silently distort every result built on top of the measurements.

This topic was the focus of a Solargis study that we presented at PVPMC 2026, looking at the impact of quality control on uncertainty in solar PV performance evaluation. For the analysis and quality control of measured data, we used Solargis Analyst, our software for visualizing, comparing, cleaning, and analyzing solar and meteorological data.

Our analysis quantified the full chain from raw measurements to final performance metrics, with three practical questions:

  1. How often do quality issues occur in GHI (Global Horizontal Irradiance) and GTI (Global Tilted Irradiance) measurements, and what bias and MAE (Mean Absolute Error) do they introduce?
  2. How well does automated quality control perform under different data conditions?
  3. How does residual measurement uncertainty propagate into PV performance indicators such as EPI (Energy Performance Index)?

The results we presented were clear: Quality control is not optional. It is a necessary step before measured data can be used with confidence.

Measured data is not error-free

Our first finding is perhaps the most important one. In the dataset we analyzed, 100% of GHI and GTI time series contained quality issues.

We evaluated 509 GHI and 77 GTI ground-measurement datasets using Solargis expert quality control procedures. The study looked at both the occurrence of quality issues across datasets and their impact on Bias and Mean Absolute Error (MAE) when left uncorrected.

In a typical dataset, the proportion of affected data points was relatively low. Median affected data points reached 3.2% for GHI and 6.1% for GTI.

But the tail of the distribution was much more severe.

At the 90th percentile, affected data points reached 18% for GHI and 15% for GTI. Persistent calibration or misalignment issues could affect up to 47% of all data points at P90.

This means that the median dataset may look manageable, but difficult cases can be seriously compromised. If quality control is not performed, there is no way to know where a specific dataset sits in this range.

马尔凯塔 表1

Table 1: Share of affected datasets and data points per selected quality issue type, for GHI and GTI. Note: Affected data point statistics are computed only from datasets where the respective issue is present.

Quality issues do not need to affect most of the dataset to matter. Even a relatively small number of problematic data points can increase uncertainty, especially if the issue introduces systematic bias rather than random noise.

Our analysis showed that leaving all quality issues unflagged amplified Bias by 5.7% for GHI and 4.6% for GTI at P90, with similar increases in MAE.

For PV performance evaluation, this matters because many decisions depend on small differences. A few percent of bias can influence whether an asset appears to underperform, whether a model appears accurate, or whether the expected and conservative production scenarios are properly understood.

In other words, measurement quality issues can enter the analysis quietly, but their effect can be large enough to distort the interpretation of performance.

This is why the safest starting assumption is simple:

Assume your measured data contains quality issues, because it almost always does.

Quality control can be automated at scale, but has limits

In the second part of the study, we looked at automated quality control.

Automation is essential because manual review of large, high-resolution measurement datasets does not scale easily. PV projects can generate large volumes of data, especially when measurements are recorded at one-minute or five-minute resolution across multiple sensors and long periods.

Our study analyzed 114 one-year datasets, each with two GHI measurements and expert quality control (QC) already applied. Each dataset was modified in several ways: aggregated to coarser time steps, reduced to a single GHI sensor, and shortened to six and three months. The purpose was to quantify how automated QC performance changes with data resolution, record length, and sensor redundancy.

The results show that automation can approach expert performance, but only under favorable conditions.

With multi-sensor, one-minute resolution datasets, automated QC achieved performance close to expert QC. In some cases, automated QC yielded a larger bias/MAE reduction than expert QC, as indicated by the expert/auto ratio.

However, performance degraded when conditions became less favorable.

Single-sensor setups and coarser time steps increased the risk of overflagging and missed issues. Without redundant sensors, automated QC missed more real problems. At P90, the expert-to-automatic ratio could reach up to 2, showing that difficult datasets still require expert review and intervention.

Interestingly, shorter data length was less problematic than expected. Six months of data performed almost identically to one year. Even three months was viable for typical datasets, although consistency decreased on more challenging sites.

马尔凯塔·菲格 1

Figure 1: ΔBias and ΔMAE [%] achieved by expert and automated QC relative to the raw measurements, using the Solargis solar resource model as reference, at median and p90. Numbers on bars show the expert/auto ratio - values below 1 indicate automation outperforms expert QC, above 1 the opposite.

The conclusion is that automated QC works best when the measurement setup is strong. Redundant sensors, high temporal resolution, and at least six months of data create much better conditions for reliable automated quality control, as well as for expert assessment.

For high-stakes assessments or difficult sites, automation should complement expert review, not replace it entirely.

Another finding is that not every quality issue has the same impact. Automated QC may miss subtle, low-impact issues but still catch the most important anomalies, keeping bias and MAE reduction close to expert level.

This distinction matters for operational scaling.

For routine data processing, automated QC can be highly valuable if it captures the high-impact problems that materially affect performance analysis. For bankable assessments, expert review remains important because low-frequency or site-specific issues may still influence conclusions, especially when uncertainty margins are tight.

In practice, the best workflow is not manual or automated. It is hybrid.

Automation handles scale. Experts handle context, edge cases, and final judgement.

How residual measurement uncertainty propagate into PV system performance assessment

The third part of our analysis looked at what happens when measurement uncertainty is carried through to PV performance assessment.

The study used one year of five-minute GHI time series with controlled quality issues injected into the data. PVOUT was simulated using Solargis Evaluate for three representative PV configurations: fixed tilt at optimal angle, horizontal north-south tracker, and vertical bifacial single-row. Simulations were performed for three climatically distinct sites.

The key finding is that input data quality directly affects the final performance metric, but the level of impact depends on system design.

For monofacial fixed-tilt and tracker systems, measurement issues in GHI typically propagated into PVOUT with a similar, though slightly reduced, magnitude. Vertical bifacial systems were more sensitive, and in some cases the impact on PVOUT was stronger than the original GHI error.

The practical implication is important: a ±2% GHI bias can translate into approximately ±2% deviation in the Energy Performance Index (EPI). A negative GHI bias can inflate EPI and hide underperformance, while a positive GHI bias can deflate EPI and make a healthy plant appear worse than it is.

This is why quality control must be performed before calculating EPI. An unchecked measurement issue can make a struggling asset appear perfectly healthy on paper.

Why does this matter for PV asset owners and operators? Three key takeaways

PV performance evaluation is often used to answer a simple question: is the plant performing as expected? But answering that question depends on the quality of the reference data.

If measured irradiance is wrong, the performance ratio, EPI, model validation, and underperformance analysis can all be distorted. A plant may appear healthy when it is underperforming, or underperforming when the real issue is the measurement reference.

This is why measurement quality control is not just a technical cleaning step. It is part of uncertainty management. The study shows that skipping QC can introduce errors comparable to the broader simulation uncertainty chain.

For PV project teams, there are a 3 key takeaways from our analysis:

  1. Audit your data: Every dataset contains QC issues. In extreme cases, uncorrected bias alone can reach the magnitude of the full simulation uncertainty chain.
  2. Invest in your setup: Redundant sensors, high-resolution measurements, and at least six months of data are prerequisites for reliable automated QC. For high-stakes assessments, automated checks should be complemented with expert review.
  3. Never skip QC before performance evaluation: An uncorrected issue can make a struggling plant look perfectly healthy on paper.

Measured data remains essential for PV performance evaluation, site adaptation, model validation, and decision-making. But it should not be treated as automatically correct. Only after proper quality control can it become a reliable foundation for lower uncertainty and more trustworthy performance assessment.

继续阅读

利用地面测量对高分辨率卫星数据进行现场调整
Success stories

利用地面测量对高分辨率卫星数据进行现场调整

Convergent求助于Solargis和GroundWork,为其太阳能加储能系统提供高度准确且针对具体地点的资源评估,以更好地了解预期性能,最大限度地增强项目利益相关方的信心。

光伏发电收益的不确定性如何影响项目工程师、投资者和银行
Best practices

光伏发电收益的不确定性如何影响项目工程师、投资者和银行

每个太阳能光伏发电项目通常都以一个简单的数字开始:预期年光伏发电量。乍一看,这个数字清晰而精确。但实际上,它总是带有不确定性。项目团队如何处理这种不确定性非常重要。它影响着工程设计、投资者预期和银行融资,而这些影响往往在项目生命周期的后期才会显现出来。

你能相信你的Pxx吗?光伏发电量的不确定性为何对你的项目至关重要
Webinars

你能相信你的Pxx吗?光伏发电量的不确定性为何对你的项目至关重要

大多数光伏项目仅依靠单一的P50值来代表预期的年发电量。但一个数字无法全面反映实际情况,更无法涵盖您的项目可能面临的结果范围。

观看本次网络研讨会,了解 Solargis 如何依托业界领先的太阳能和气象数据、经过验证的建模方法以及透明的方法论,计算光伏发电量的不确定性。