Averaging irradiance subhourly data into hourly data has been a common practice in the solar energy industry for years. It has provided a way to harmonize datasets of different granularities and allowed older computers to run simulations. But it has also hidden useful data records for an accurate calculation of expected losses.

The consequence of this is clear: Running PV simulations on an hourly dataset gives less accurate results than running them on a subhourly one. This is especially noticeable for inverter clipping loss, key for the estimation of the optimal DC/AC ratio of PV plants.

In this article, we show how data granularity matters for building robust PV projects. Taking a site under variable sky conditions as a sample, we illustrate why using hourly datasets is a risk that developers and technical advisors can avoid. 

Clipping loss "by design"

Every PV plant has an inverter, and every inverter has a ceiling. When the DC power delivered by the solar array exceeds the inverter's rated input capacity, the inverter simply caps its output. The energy above that ceiling is lost, not stored, not redirected, just discarded. This is clipping.

But clipping is not a fault or a failure. It is a deliberate design consequence of the power plant’s DC/AC ratio. A higher DC/AC ratio means a higher number of modules per inverter, allowing the plant to generate more total energy by raising output during the many low-irradiance hours, at the cost of clipping the few peak hours. 

To decide on the optimal DC/AC ratio, the question is whether the energy gain minus clipping loss justifies the extra panels cost. Since the DC output is affected by degradation, it is important to consider gain and loss across the project lifetime in order to calculate it properly.

剪切损耗
Fig. 1. Two daily profiles showing the same irradiance day. On the left chart, the curve stays below the inverter ceiling at all times, with no clipping. On the right chart (higher DC/AC ratio) extra energy compensates for clipping loss.

 

The subhourly nature of clouds

Since knowing the optimal DC/AC ratio depends on loss calculation, the key question moves to: Is the inverter clipping loss correctly captured?

The traditional input to popular yield models is an hourly dataset, i.e. one GHI value per hour. However, it carries a structural blind spot: It cannot represent anything that happens within the hour.

Since clouds form, move, and dissolve in minutes, the irradiance during those intervals can strongly swing in the gap within a single hourly interval. When that hourly interval is averaged, the swing disappears.

This is not a problem with the yield simulation itself. It is a problem with the input data. A simulation can only calculate what its inputs allow it to see. So the key question of whether the inverter clipping loss is correctly captured opens another one: Does the irradiance data used in the yield simulation have enough temporal resolution to see the most important cloud variations?

It is important to note that temporal resolution is not the only way yield simulations lose information. Condensing a multiyear time series into a Typical Meteorological Year (TMY) hides variability too, becoming another blind spot for the simulation (covered in this article for the case of thermal loss). But here we focus on resolution alone and what changes when the same data is simulated at subhourly vs. hourly steps.

The irradiance histogram and the long tail

When analysing solar irradiance distributions, one of the most informative outputs of PV simulation software is the irradiance frequency histogram. This chart shows how frequently irradiance falls within each intensity band over the full multiyear simulation period.

In the histogram, the horizontal axis represents irradiance, measured in watts per square metre (W/m²) and divided into bins of equal width. The vertical axis indicates the frequency of irradiance values within each bin, expressed as a percentage of all daytime records.

When the histogram is plotted twice, once for the subhourly (subhourly satellite-based original resolution) record and once for the hourly record (hourly averages derived from the subhourly), the two distributions may look quite similar across most of the range. 

However, when calculating the differences between both, we can see to what extent the frequency of subhourly values is higher than the frequency of hourly values.  The hourly distribution has averaged irradiance peaks away; not because they did not happen, but because they did not last a full hour.

That divergence in the irradiance tail is the visual representation of the difference that will affect the clipping loss estimation in the simulation.

The impact of underestimated clipping

In the analysis conducted for this article, using hourly rather than subhourly input data changes the simulation results, leading to an underestimation of losses and an overestimation of energy yield. This overestimation translates directly into a potential revenue shortfall that is not captured in the original financial model.

But the consequences extend beyond revenue, and a change in clipping loss value can make the optimal DC/AC ratio shift. If the optimisation using higher resolution data returned a lower ratio than the hourly model suggested, that could have been translated into fewer panels per inverter. Capital cost that the project could have saved. A lower loan the project could have borrowed.

Satellite-based models provide several data points per hour,  typically one value every 15 minutes. This can offer a good compromise between data availability and temporal resolution for many PV projects.

However, for certain projects and locations, it may be beneficial to increase the temporal resolution of the original satellite-derived data. Synthetic models can be used for this purpose, generating a 1-minute variability profile inferred for the specific location from ground-measured 1-minute datasets.

Although these synthetic 1-minute profiles do not represent actual measured irradiance values, they can reproduce the statistical distribution of irradiance peaks reasonably well. This is particularly important for accurately estimating inverter clipping losses.

Subhourly data reduces potential revenue loss

A more accurate clipping loss estimate is an opportunity to improve the design of PV plants. The process goes like this:

  1. PV simulation software is fed with sub-hourly irradiance time series that preserve peaks that hourly averaging smooths out.
  2. The yield simulation captures clipping loss more accurately, usually showing higher losses than hourly data, and gives more reliable energy and revenue projections.
  3. The development team can choose a DC/AC ratio that better balances clipping losses against equipment savings, getting closer to the design that maximizes project value.

Although satellite-based 15-minute data can be a good compromise in many cases, an additional analysis of the distribution using 1-minute synthetic data is recommended for plants with high DC/AC ratios located under skies with high variability (such as those in tropical climates, as shown in the sample).

Compared to hourly datasets, subhourly inputs remove unnecessary risks and improve the bankability of the PV plant. They also bring stakeholder expectations closer to realistic values, which increases confidence in the project.

继续阅读

1 分钟、15 分钟和 60 分钟太阳数据的优缺点
Best practices

1 分钟、15 分钟和 60 分钟太阳数据的优缺点

根据数据源和所需应用的不同,太阳能数据可以有不同的时间分辨率,如每小时以下(1、2、5、10、15、30 分钟)或每小时间隔。但是,您怎么知道它们的区别呢?

TMY的盲点:温度数据失真如何影响光伏电站
Best practices

TMY的盲点:温度数据失真如何影响光伏电站

您的模拟是否考虑了光伏电站选址处的实际温度条件?如果您使用“典型气象年”(TMY)数据集作为输入,简而言之,答案是“并不完全如此”。 通过对某样本站点的 Solargis 时间序列数据和 Solargis TMY 数据进行分析,我们揭示了 TMY 数据为何无法长期准确反映高温情况,这可能会给光伏项目带来不必要的风险。

为何在光伏性能评估中使用基于卫星的太阳能资源数据
Best practices

为何在光伏性能评估中使用基于卫星的太阳能资源数据

人们普遍认为,在严格控制的条件下运行的高标准测温仪可用于光伏(PV)发电系统的银行可担保性能评估。