Finding suitable land for utility-scale solar is rarely a simple question of identifying where the solar resource is strongest. Land use, agriculture, protected areas, terrain, infrastructure, and other constraints can significantly reduce the areas where projects can realistically be considered.

This is why early-stage PV planning requires more than solar resource maps. It requires a structured geospatial methodology that can combine technical, environmental, and social factors into a clear view of where solar development is feasible.

This challenge was explored as part of the Solar Mapping and Development Plan, an international project supporting solar development in Indonesia’s JAMALI – Java, Madura, and Bali – region (see more about the project at the end).

Solargis Evaluate 普尔瓦卡塔太阳能项目 III 1

Image 1: In recent years, one of the most significant utility-scale PV development in the JAMALI region has taken place around Purwakarta, West Java. The screenshot from Solargis Evaluate shows an 11 MWp section of a larger solar PV cluster, launched in 2025.

As part of the project, Solargis contributed the geospatial analysis, which formed the first stage of a broader assessment that also included environmental and social, grid integration, financial, and regulatory analyses.

The geospatial analysis ultimately identified approximately 700 GWp of theoretical potential and provided the basis for selecting 151 high-scoring qualified sites for further study at prefeasibility level.

At EU PVSEC 2026, we presented the methodology and findings of our geospatial work. The results demonstrate why high solar potential alone tells us relatively little about where utility-scale PV can actually be located.

The challenge: Finding utility-scale PV potential in Indonesia’s JAMALI region

Indonesia has ambitious objectives for solar PV development. Around 184 GW of wind and solar capacity is needed by 2060, while the reality is that installed solar PV capacity was only around 1 GW by 2024. The JAMALI grid is particularly important as Indonesia’s largest electricity system and home to much of the country’s electricity demand.

The starting question for the geospatial analysis was straightforward: Is there enough space for tens to hundreds of gigawatts of utility-scale PV in JAMALI, an environmentally complex and densely populated area?

The answer turned out to be yes.

Our analysis identified approximately 12,519 km² of qualified land (around 9% of the region’s total land area). In theory, this area could accommodate approximately 700 GWp of utility-scale PV capacity. In practice, only a fraction of this potential needs to be developed, allowing the next stages of the analysis to prioritize the most suitable locations for solar projects.

mcdm 数据掩码 v4

Figure 1: Map of JAMALI showing land qualified for potential utility-scale PV development.

Qualification and scoring reveal different parts of the picture

Data

The analysis combined global open datasets, local authority data, and proprietary Solargis datasets.

Each source brought different strengths. Global datasets make country-scale analysis possible even where local data is limited. Local datasets provide more detailed information on land use and locally relevant restrictions. Solargis data adds high-quality solar and terrain information, including short-term solar resource variability, a specialized Solargis layer for which no comparable public dataset is available.

Because these datasets came from different sources and at different resolutions, they were harmonized into a common spatial framework before the analysis.

Methodology

The methodology used two complementary steps:

1/ Qualification

Qualification determined whether an area could be considered for utility-scale PV at all. Each location had to pass all qualification criteria; failing a single exclusion criterion removed it from the qualified area.

资格领域

Figure 2: Examples of map layers used during area qualification assessment.

Among the individual qualification criteria, land cover and soil type were the most restrictive. Only 39% of the analyzed area passed the land-cover criterion, while 43% passed the soil criterion. By comparison, much larger shares passed criteria related to slope, protected areas, volcanic activity, indigenous territories, and cultural heritage.

The soil criterion is particularly important in the Indonesian context. Rather than excluding agricultural land altogether, the methodology was designed to retain lower-productivity soils where PV development could potentially be considered while protecting more productive agricultural land.

2/ Scoring

Scoring assessed the relative suitability of locations based on factors such as solar power potential, short-term variability, terrain, road accessibility, and seismic and volcanic activity. These factors were combined into a composite score reflecting productivity, risks, and costs.

SCORE

Figure 3: Final scoring composite showing the relative suitability of areas based on solar potential, development practicality, and risk-related criteria.

The scoring and qualification maps were then combined to identify qualified areas with the strongest overall scores.

SCORE 被屏蔽

Figure 4: Final suitability map combining qualified areas with composite score.

The analysis showed a significant difference between areas that scored highly and those that were actually qualified for potential PV development. Some of the highest-scoring areas, particularly along Java’s northern coast, overlapped with densely built-up areas or productive agricultural land and were therefore excluded during qualification.

Favorable solar and technical conditions do not necessarily mean that a location is suitable for PV development. Land availability and existing land use can significantly constrain the developable area, making it smaller and more fragmented.

Geospatial analysis is the starting point, not the final development decision

The geospatial analysis identified theoretical spatial potential and provided the basis for the subsequent stages of the Solar Mapping and Development Plan project. It did not determine which projects were ultimately bankable or development-ready.

Using the geospatial results, 151 sites in high-scoring qualified areas were selected for further study at prefeasibility level. The project continued with environmental and social analysis, grid integration assessment, financial analysis, and regulatory analysis.

The broader project then showed how dramatically theoretical potential can narrow once other constraints are considered. While the geospatial analysis identified approximately 700 GWp (approx. 540 GWac) of theoretical potential, the grid integration assessment indicated a maximum of 5.3 GWac of utility-scale PV connectable to the grid by 2030, based on existing grid expansion plans.

This distinction is important. Geospatial analysis answers an early but fundamental question: “Where is there enough suitable space to investigate further?”

It does not replace grid, environmental, social, legal, or financial assessment. Instead, it provides a structured starting point for these analyses and helps avoid spending time evaluating locations that are unsuitable from the outset.

The results were ultimately presented to BAPPENAS (the Ministry of National Development Planning of the Republic of Indonesia), and made available to PLN (Indonesia’s state-owned utility company) and developers through interactive maps designed to reduce the effort required for preliminary site assessment.

Why this methodology matters beyond Indonesia

Although this work focused on JAMALI, the underlying geospatial methodology is replicable in other countries and regions.

The core workflow is straightforward: Collect and harmonize data, apply qualification layers to exclude unsuitable areas, score the spatial potential, and translate the results into practical planning outputs.

A basic country-scale analysis can be completed relatively quickly using globally available datasets and Solargis proprietary data. However, the quality of the output improves significantly when quality local data sources are available.

For example, land-cover classes, protected areas, cultural heritage datasets, local development regulations, land ownership, land prices, regional plans, grid infrastructure, and specific risks such as erosion can all improve the analysis.

This is why geospatial mapping should not be seen as a one-size-fits-all exercise. The methodology is transferable, but the inputs should be localized wherever possible.

Local experts are essential for this step. They help adjust the scoring logic, interpret constraints, and align the methodology with real planning priorities, regulatory conditions, and project risks.

Floating PV as another part of Indonesia’s solar potential

The project also assessed the potential for floating PV, which is particularly relevant in Indonesia, where land availability can be a major constraint on utility-scale solar development. Applying the regulatory maximum of 20% area utilization to suitable reservoirs, the analysis identified approximately 7.2 GWp of floating PV potential.

Floating PV deserves a closer look of its own, especially as some of Indonesia’s largest solar projects are being developed on reservoirs. We will explore this part of the analysis in more detail in a separate article.

More about the Solar Mapping and Development Plan

This activity was carried out as part of the Solar Mapping and Development Plan, supported by the Energy Transition Partnership (ETP) and UNOPS to help Indonesia’s Ministry of National Development Planning (BAPPENAS) accelerate investment in the solar energy sector. The project was led by Trama TecnoAmbiental (TTA), with Solargis as one of the technical partners, alongside PT Quadran Solusi Enjinering, PT Inovasi Dinamika Pratama, and Environmental Resources Management (ERM).

The project outcomes are available on the project website.

Read the final project report in full here.

继续阅读

利用地面测量对高分辨率卫星数据进行现场调整
Success stories

利用地面测量对高分辨率卫星数据进行现场调整

Convergent求助于Solargis和GroundWork,为其太阳能加储能系统提供高度准确且针对具体地点的资源评估,以更好地了解预期性能,最大限度地增强项目利益相关方的信心。

场地适应性:提高太阳能发电量估算可靠性的方法
Best practices

场地适应性:提高太阳能发电量估算可靠性的方法

根据具体位置和条件,基于卫星的太阳能资源数据通常存在约4%至8%的不确定性。通过高质量的地面测量和适当的场地适应性调整,这种不确定性通常可降至3%至5%左右。这一降幅看似微小,但对于许多公用事业规模的光伏项目而言,却具有重要的商业意义。

为何测量数据的质量控制对光伏性能评估至关重要
Best practices

为何测量数据的质量控制对光伏性能评估至关重要

地面测得的太阳能数据通常被视为基准数据。它用于评估光伏电站的性能、验证模型、根据当地条件调整基于卫星的数据集、计算预期发电量,以及评估资产是否按预期运行。但测量数据绝非完美。 仪器故障、安装问题、环境影响、污损、遮挡、校准漂移以及传感器对准偏差都可能引入误差。